![]() ![]() Back up/restore machine shipment control data. Installation Specifications Preparation for Installation Installation Procedures (Mechanical) Installation Procedures (Software Setup) Installing Optional Items When Installed in Patient Environment Registering the Master CL Setting the Barcode Reader RU/CL Software Setup Checkpoints Documents and References to be Used When Trouble Occurs Software Control (relationship with CR Console) System Block Diagrams Electrical Block Diagrams/Short-Circuit Detection Circuit Diagrams (Disconnection check) I/O Locations and Their Functional Overview SNS17B Board LEDs DRV17A/17B Board LEDs Unit Locations Roller Locations/Conveyance Paths Image Data Flows Voltage check Checkpoints during Preventive Maintenance Preventive Maintenance Programs List of Preventive Maintenance Replacement Parts: 2-Year Intervals 3-Year Intervals Procedures Software Related Checkpoints Install/version update software and applications. Connection is not established between RU and CL. ![]() The LCD panel does not transition to its default screen. GUIDE PAGE To Table of Contents of Service Manual How to Use PDF Manual PROFECT CS/ClearView CS XG5000 Checkpoints during Installation Checkpoints When Trouble Occurs Search the error code.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |